What should you do before install the Fibre Optic Patch Panel


by Fiber-MART.COM
What should you do before install the Fibre Optic Patch Panel
 
 
Many people have a brief introduction of fibre patch panel may from the Google or my blog, well, but when we really want to use the Fibre Optic Patch Panel, what preparations of the patch panel we should do, this article will give you the answer. As for some people say that my blog has too few pictures, and i try to show more.
 
First, ensure a length od spare cable (slack) is provideed within the caninet (5m recommend). As well as being required to facilitate the termination of the cable will allow for the possibility of Pre-terminated patch Panel, repair and ability to relocate the panel if required in the future.
 
Spare cable may require special stowage requirements in the installation. Before termination, always cut off the first metre of cable as this part can be damage after pulling the cable, bending etc…The removal of this 1m section to the final amount of cable slack provided.
 
The L-shape brackets of the chassis can be installed forward or recessed. By default, it is installed in the forward position. Change it to t he right position is dependant on the available space between the 19″ frame and tge cabinet door.
 
Then, position the chassis into the rack.
 
Remember to complete earthing requirements for metallic items using the screw and star washer provide on a suitable earthing cable.
 
The hole for the screw is located at the rear of the panel on the left hand side of the chassis
 
Thread the cable through the chassis of the Black Box Patch Panel. Make sure to respect the minimum bending radius while handling the cable.
 
Tips:
 
1. Sliding drawer preparation
 
For direct termination or pre-term installation: install the 4 support bases using the 4 small screws, washes from the screw kit provided and insert 4 loop rings on every support base, with the loop ring opening facing inwards. They will be used later to support the fibres.
 
2. For splicing
 
Install the first splice cassette on the drawer using the 2 longer screws and associated locking washers from the screw kit. The addtional cassettes will be installed at a later stage. To connect the addtional splice cassettes the hinges at the back of the splice cassettes will be used. Up to 4 splice cassettes can be intalled according to the number of fibres to be terminated.
 
Now I work for fiber-mart, a famous fiber optical product website, you know, include above all the items. And if you have some interested in it, welcome eo communicate with us. Our fiber-mart has Facebook and Google+ page, you can search it easily and get the newsest information after you add it. Thanks for your attention.

Suggested Similar Articles

About the Author

Leave a Reply

Your email address will not be published. Required fields are marked *